Project overview

Programme leadership

As part of the evolution of Standard Chartered’s existing outsourced strategic partnership, there was an opportunity to build an independent programme management office (PMO) to oversee the built-asset programme.

We were brought on board with an initial mandate to set out a globally consistent governance and assurance framework, ensuring that all property projects and programmes are consistently reported and delivered, but we also had the much larger task of delivering a suite of strategic initiatives to drive innovation.

Through our dedicated focus to driving improvements and efficiencies for the bank in digital, procurement and cost management, we have secured a total return on investment of 45 percent over the past four years.

Project story

Building a digital picture

Our key focus has been to lead Standard Chartered Bank property’s digital transformation by implementing a new delivery model, centred around best practice information management and building information modelling (BIM).

We have established information requirements, standardised data structures, built BIM object libraries, preconfigured spaces, transitioned the design team from a traditional to BIM-centric design process and launched a global cloud-based common data environment, enabling collaborative design and safeguarding the bank’s data. All of which has resulted in the same, upskilled team, to deliver 72 percent more work and to do so 18 percent quicker than before. This new model has delivered 39 percent in cost savings and 22 percent reduction in time to deliver.

We have 3D scanned the bank’s 20 most significant buildings to build a digital picture of its estate for future redesign, to excite and engage customers and colleagues, monitor progress of construction and provide high definition 3D models. We estimate that the 3D scans have enabled the bank to avoid 1.85 metric tonnes of carbon through virtual fly-throughs, reducing a large number of international flights to visit site.

Next steps are to embark on how we can leverage the digitised project information to support carbon and cost estimates, leverage generative design to design test fits for early stakeholder engagement and develop a digital asset information management strategy to connect asset data to the physical sensory network to enable unparalleled end-user experiences.

Driving process improvements to deliver greater value at pace

We are delivering a programme of more than 50 office fit-out and retrofit projects globally. Delivering projects for highly regulated businesses, such as banks, requires a considerable amount of supply-chain preparation. One of our major breakthrough innovations has been the creation of a dedicated procurement and contracts team responsible for pre-screening contractors to enable rapid and safe project mobilisation and establishing strategic frameworks to enable rapid deployment of consultant teams.

Critical to a programme has been leveraging volume to negotiate better savings. To date we have helped Standard Chartered to secure $13m of procurement savings, with a further $16m to be secured over the next two years.

Fundamental to our role as PMO is to support our broader consultant supply chain by delivering over 400 hours of training per annum and increasing average project assurance scores to 95 percent, 18 percent higher compared to our inception in 2019 through introduction of a rigorous stage gate process.

We have supported the bank’s retail-design team to deliver design packs twice as fast with half the resource, overall reducing costs by 75 percent. We have also enabled the design teams for offices to collaborate significantly faster through the common data environment, and we’re targeting a 50 percent reduction in the timescales for main contractor procurement.

related

You might also be interested in these projects

Exterior shot of the Quai Zurich Campus in Switzerland.Image courtesy: Zurich Insurance Group
Switzerland

Transforming the Quai Zurich Campus with Zurich Insurance Group

2 min read

Image of bright plant filled office space with blue chairs and glass windows which allow sun to shine through.
The Netherlands

Transforming the Energy Transition Campus Amsterdam with Shell

2 min read

The Google Thompson Center in Chicago, a 17-storey, glass fronted building set to a backdrop of cars and greenery. Image courtesy: Jahn
United States

Transforming Chicago’s Thompson Center with Google

2 min read

Exterior shot of Shell Headquarters, The Hague
The Netherlands

Transforming a major headquarters in the Hague with Shell

2 min read

Modern Adidas offices with wooden interior and two people walking while a woman talks to a man at a reception desk
United States

Supporting the East Village expansion with adidas

2 min read

Kraft Heinz office in Japan. It has green carpets with a window facing the city
Japan

Shaping an inspiring new workspace with Kraft Heinz Japan

3 min read

Birds eye view of ANTA Shanghai HQ, surrounded by trees and blue sky
Greater China

Partnering on a new Shanghai Headquarters with ANTA

3 min read

Interior of a warm, light-filled modern office with a shelf of objects and an orchid on the reception desk
United Arab Emirates

Delivering the landmark office project 6 Falak with Sweid & Sweid

2 min read

Exterior shot of Salesforce Tower in Sydney, Australia.
Australia

Delivering Sydney's tallest office building with Salesforce

2 min read

Bright plant filled office space with glass windows and shelf full of books. There's a man in the corner on a orange chair.
United Kingdom

Delivering Five Bank Street with The European Bank for Reconstruction and Development

2 min read

Exterior shot of Barclays Glasgow Campus in the UK.
United Kingdom

Delivering a new corporate campus in Glasgow with Barclays

2 min read

Modern curved glass building with a large central arch, surrounded by greenary and nearby city buildings.
Korea

Delivering a flagship workplace with JYP Entertainment

2 min read

Image of Dubai Salesforce office at night, glass windows that reflects the purple ambiance of the night sky.
United Arab Emirates

Delivering a flagship Middle East headquarters with Salesforce

3 min read

Field being harvested with wind turbines adjacent.
Global

Decarbonising workplaces worldwide with Shell

2 min read

The exterior of a modern, green building with foliage and seating next to it. Image courtesy: Seen Australia
Australia

Creating Yarrila Place cultural and civic space with City of Coffs Harbour

3 min read

Google Bay View in the USA.Image courtesy: Iwan Baan
United States

Creating a workplace for the future at Google Bay View

3 min read

A futuristic, white multi-story office campus building.
United Arab Emirates

Creating a sustainable workplace campus with Masdar City 

2 min read

A spacious balcony at One Blossom Yard, UK, features chairs and a small table with potted plants. The skyline and distant mountains create a scenic backdrop against a cloudy afternoon sky.
United Kingdom

Creating a new sustainable headquarters with Reed Smith

2 min read

A group of people in a modern office furnished with plants and colourful furnitureImage courtesy: M Moser Associates (design) and Stijn Poelstra (photography)
The Netherlands

Creating a flexible, future-ready Amsterdam workspace with Pinsent Masons

2 min read

VISA's HQ in Dubai
United Arab Emirates

Creating a flagship regional HQ with Visa

2 min read

Stanbic Bank's head office in Zimbabwe
Zimbabwe

Building a new Harare headquarters with Stanbic Bank Zimbabwe 

2 min read

BDA first building with green grass on roof and glass windows.
Australia

Bringing programme certainty to the First Building at Bradfield City Centre

3 min read

Interior shot of Tower Hamlets Town Hall with person walking down corridor.Image courtesy: Paul Raftery
United Kingdom

Bringing a historic building back to life with Tower Hamlets Town Hall

4 min read

EXPLORE MORE
A group of employees having a casual chat in the break room with a table with apples.
Services
Battersea Power Station lit up at night, view from the Thames with buildings in the backgroundImage courtesy: Placeholder
Sectors
Male and female colleagues having a casual chat in the break room.
Join us